Address
A-1103, 767, Sinsu-ro, Suji-gu, Yongin-si, Gyeonggi-do
(Dongcheon-dong, Bundang Suji U-Tower)
Contact us
(T) +82-31-525-3800
(F) +82-31-525-3801
For EN. +82-31-525-3805
SATELLITE ONBOARD SYSTEM
Satellite bus power
subsystem EGSE
Satellite Bus Power Subsystem
Electrical Ground Support Equipment
Satellite bus power subsystem EGSE
Satellite bus electric power subsystem EGSE supplies power needed for ground testing and validation during Assembly and Integration Test. It also offers load simulation to exhaust power stored in satellite, satellite’s power subsystem monitoring, signal acquisition and simulation, and solar array simulator.
Equipment Characteristics
As part of KOMPSAT-7 project, Lumir successfully localized the solar array simulator(SAS) which had been 100% dependent on foreign sources. The successful task completion, subsequent order for power subsystem EGSE for electro-optical and infrared(EO/IR) satellites, and technology capability have offered Lumir a competitive edge in a space sector.
ㆍSize: 19-inch standard rack, 22 U-1 set, 35U - 2 set
ㆍWeight: < 900 kg
ㆍSatellite Bus/Battery Power Supply: 5000 W / 80 V / 60 A (Full Load)
ㆍSimulating Solar Panel Power Supply: 900W/150V/15A (Full Load) for each channel
ㆍMaximum Power Consumption: < 16000 W
ㆍInterface: 1553 B, UART, Ethernet
ㆍSelf-powered mode runs for over 10 minutes in case of dangerous situation(power saving) is detected